CAMPAIGN VALUE DURING AUGUST/2026
Ready for deed transfer.
The payment of the CPCV will be made with a 10% deposit and the rest at the deed.
FINISHING SCHEDULE
RELEVANT FEATURES
? Acoustic Insulation
? Heat pump installation for water heating
? False ceilings throughout the apartment
? Interiors with light tones, increasing Natural Light Efficiency and decreasing Artificial Lighting
? Indirect light coves and LED Spotlights
? TV sockets in the living room, kitchen, and bedrooms
? Cream-lacquered Pivot or Hidden Hinge Doors
? Cream-lacquered Wardrobes with drawers, shelves, and hanging rail in all bedrooms
? AC6 Oak floating floor (halls, bedrooms, living room, and service bathroom)
? Electric exterior sun blinds
? Pre-installation for interior blackout
? Pre-installation of Dolby Surround Sound System (Bedrooms and Living Room)
? Central vacuum system
? Air conditioning installation (Bedrooms and Living Room)
KITCHEN
? Cream-lacquered fire-retardant MDF furniture
? Silestone countertops
\• Rectified porcelain tile flooring
l• Painted wall
l• Bosch brand appliances (Oven, Microwave, Induction Hob, Dishwasher, Fridge and side by side Freezer) Falmec brand ceiling extractor hood
l• Black mixer tap
l• Laundry sink only in T3 and T4 apartments
HOUSE BATHROOMS
l• Wall and floor coverings in cream-toned porcelain material
l• LED Spotlights and Indirect Lights
l• Suspended vanity units, lacquered in Cream
l• Suspended sanitary ware
l• Black taps
l• Shower tray surrounds/guards
l• Suite and support bathrooms equipped with Black shower kits
OUTDOOR AREA
l• Cappotto and Alucobond facade - Thermal insulation from the exterior
l• Window frames with thermal break and double glazing
l• Video intercom with color screen)
|
l• Closed garage for 2 cars Energy Class: B
Characteristics