Video

Apartment for sale in La Londe-les-Maures

995 000
143 m²
4 main rooms
REF :
84586479
995 000

LA LONDE: NEW FLAT ROOF - TERRACE - SEA VIEW

New duplex flat with sea views, on the top floor with a terrace in the heart of La Londe Les Maures town centre.
This 144 m² T4 flat has 3 bedrooms, two of which are en suite, and a mezzanine that could be used as an office or relaxation area. The kitchen, fitted with quality equipment, is located in the centre of the living area, with magnificent sea views. The lounge/living room has high ceilings, making it vast and bright. It opens onto a 36 m² south-facing terrace, providing a privileged outdoor space to relax and enjoy the sea view and sunshine all year round.
The residence is modern and finished to a high standard. It is located close to shops and amenities.
2 basement parking spaces complete this property.
If you're looking for an unusual, modern lifestyle with luxurious comforts, this is the perfect property for you.
FLAT - NEW - TERRACE - SEA VIEW - HYERES - LA-LONDE-LES-MAURES

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
IMMOCOACH - Luxury Properties & Yachting
8, rue Victoire Mangot - CARQUEIRANNE ou Espace Carré Vilette, 526, chemin de la Vilette - HYERES
ou Rue du 11 Novembre 1918 - SAINT-TROPEZ
83320 - Carqueiranne

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Fees paid by the seller
  • Average yearly fees : 1 912,00 €
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Main rooms : 3

Main rooms : 3

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

45 |2
2
Dpe completed after July 20, 2021