Video

House for sale in Bordeaux

1 040 000
473 m²
7 main rooms
REF :
87043641
1 040 000

HAUTS DE CENON - THE CHARTREUSE AND ITS SWIMMING POOL

This architecturally preserved chartreuse with 385 m² of living space is located in the hills above Cenon, in a residential area close to Parc Palmer.
Set in 4,000 m² of wooded grounds with swimming pool, it offers spacious accommodation. The living room opens onto a south-facing terrace with unobstructed views over the park. The living room retains its original features, with parquet flooring, fireplace, moldings and high ceilings. The kitchen is fully fitted and equipped. The night space includes four bedrooms with fitted closets and a vast dressing room.
On the garden level, an independent room of approx. 100 m² with outside access offers numerous layout possibilities. A winter lounge overlooking the garden provides year-round enjoyment. Garage and cellar complete the ensemble.
A property with generous, authentic volumes, ideal for a large family or a professional project. See the phone number

Ask for more information through your contact person

Consult our privacy policy.
AGENCY DOUGLAS ELLIMAN BORDEAUX - Logo
DOUGLAS ELLIMAN BORDEAUX
32 place Martyrs de la Resistance
33000 - Bordeaux

Photos of the property


navigation
Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Price fees included : 1 040 000 €
  • Price fees excluded : 990 000 €
  • 5,05 % of fees, VAT included, paid by the buyer
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Main rooms : 4

Main rooms : 4

Intercom

Intercom

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

222 |45
45
Dpe completed after July 20, 2021