Video

House for sale in Saint-Jean-Cap-Ferrat
900 m²
26 main rooms
REF :
9503

SAINT-JEAN-CAP-FERRAT: Belle Epoque mansion

This magnificent Belle Époque-style property is situated in the heart of Cap Ferrat on a plot of 3,605 m².
The main house, spanning approximately 850 m², boasts spacious interiors and an elevator serving all floors. The ground floor comprises an entrance hall, a reception room, a covered terrace, a dining room, a large kitchen, and an office.
The first floor features three beautiful bedrooms, each with an en-suite bathroom or shower room, a walk-in closet, and private access to the terrace. The second floor houses two spacious suites—complete with walk-in closets and balconies—and a large office.
The garden level includes a vast family room with a pantry, two additional en-suite bedrooms with walk-in closets, a laundry room, and a wine cellar.
The stunning free-form swimming pool is complemented by a pool house featuring a pleasant covered terrace set up as a summer lounge, a kitchen, a spa area with a sauna and steam room, a gym, a changing room, and a shower.
Staff accommodation, magnificent Mediterranean gardens, and a garage for several vehicles complete this exceptional property. See the phone number

Your advisor - Photo 4
Ask for more information through your contact person

Consult our privacy policy.
AGENCY DOUGLAS ELLIMAN CAP FERRAT - Logo
DOUGLAS ELLIMAN CAP FERRAT
1 avenue Denis Séméria
06230 - Saint-Jean-Cap-Ferrat

Photos of the property


navigation
Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Fees paid by the seller
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website: www.georisques.gouv.fr

Characteristics

Main rooms : 8

Main rooms : 8

Air conditioner

Air conditioner

Information on the risks to which this property is exposed is available on the Géorisques website: www.georisques.gouv.fr

Energy and Risks

140 |5
5
Dpe completed after July 20, 2021