Video

Apartment for sale in Saint-Jean-Cap-Ferrat

1 780 000
200 m²
5 main rooms
REF :
85614656
1 780 000

Exceptional duplex with sea view

Exceptional Duplex in Saint-Jean-Cap-Ferrat Ideally located just 100 meters from the village center and the beaches, this superb 105 m² duplex (115 m² on the ground) completely renovated in 2024 offers a rare and privileged living environment. On the main level, a Master bedroom with bathroom and Italian shower, dressing room and private terrace of 12 m², as well as two bedrooms, each with its own shower room, and a guest toilet. On the upper floor, a vast living room of 36 m², bathed in light, opening onto an exceptional 80 m² teak terrace, with breathtaking views of the sea and the village, equipped with a summer kitchen and an outdoor shower, as well as a laundry room. In addition, a cellar and one closed garages. A rare opportunity for lovers of refinement and comfort in one of the most sought-after locations on the Côte d'Azur. See the phone number

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
AGENCE DE LA PRESQU’îLE
3 - 5 Boulevard Maréchal Joffre
06310 - Beaulieu-sur-Mer

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Price fees included : 1 780 000 €
  • Price fees excluded : 1 695 238 €
  • 5,00 % of fees, VAT included, paid by the buyer
  • Average yearly fees : 4 400,00 €
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Main rooms : 3

Main rooms : 3

Air conditioner

Air conditioner

Intercom

Intercom

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

98 |2
2
Dpe completed after July 20, 2021