Video

Apartment for sale in Le Cannet

1 590 000
107 m²
4 main rooms
REF :
86951745
1 590 000

LE CANNET VICTORIA TOP FLOOR 3 BEDROOMS SEA VIEW

Located in the sought-after Cannet Victoria neighbourhood, within a beautiful residence featuring a swimming pool, this bright four-room top-floor flat measures 107 m² and is extended by a large south-west facing corner terrace offering splendid views of the sea, the Esterel and the Suquet.
In a quiet, unobstructed location, this tastefully and fully renovated flat comprises:
Entrance hall, living room, separate kitchen with a glass partition opening onto the living room, a master bedroom with en-suite shower room and access to the 35 m² sea-view terrace, two further bedrooms (one with a private terrace), a shower room, separate toilet, and plenty of built-in cupboards.
An underground garage, a parking space and a cellar are included with this property.
Information on the risks to which this property is exposed is available on the Géorisques website: www.georisques.gouv.fr
Agency fees of 4% payable by the buyer are included in the advertised price.
Translated with (free version) See the phone number

Ask for more information through your contact person

Consult our privacy policy.
AGENCY Reicherts immobilier - Logo
Reicherts immobilier
42 Avenue Isola Bella
06400 - Cannes

Photos of the property


navigation
Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Price fees included : 1 590 000 €
  • Price fees excluded : 1 529 000 €
  • 3,99 % of fees, VAT included, paid by the buyer
  • Average yearly fees : 4 800,00 €
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website: www.georisques.gouv.fr

Characteristics

Main rooms : 3

Main rooms : 3

Air conditioner

Air conditioner

Information on the risks to which this property is exposed is available on the Géorisques website: www.georisques.gouv.fr

Energy and Risks

110 |4
4
Dpe completed after July 20, 2021